www免费_嫩草在线播放_蜜臀色av_在线www_国产高清自拍一区_色99在线观看

shibangsy@163.com021-3636 7599
Hone / Product / Curtain wall anchoring / High-strength chemical anchor

HILTI HVAHigh-strength chemical anchor

product description

It is made of high-quality carbon steel or stainless steel and is suitable for cracked concrete and non-cracked concrete. It can be customized according to customer needs.

Material

Galvanized carbon steel / stainless steel


Product advantages

1. Chemical tube composition: vinyl resin, quartz particles, curing agent

2. The glass tube is closed for packaging to facilitate visual inspection of the quality of the tube. After the glass is crushed, it acts as a fine aggregate.

3. Anti-acid and alkali, heat, fire, low temperature sensitivity

4. No expansion compressive stress on the substrate, suitable for heavy loads and various shock loads

5. Installation spacing and margin requirements are small

6. Quick installation, rapid curing, does not affect the construction progress

7. Wide range of construction temperatures


Applicable substrate

1. Planting of new concrete without pre-embedded steel

2. Applicable to the reinforcement and transformation project, the rooting of the screw and steel in the substrate

3. Various equipment, pipeline installation, curtain wall bracket fixing

4. Bonding and fixing of wooden members, plastic members and metal members

5. Applicable to the reinforcement of railways, highways, bridges, water conservancy renovation and expansion projects

6. Billboards, tunnel lines, elevated road baffles and guardrails

7. Suitable for all kinds of curtain wall stone hanging brackets fixed


Construction process

1, substrate drilling

Drill the substrate with professional drilling tools and impact hammers according to the dimensions required by the design drawings

2, cleaning the hole

Use the compressed gas to blow out the dust in the hole, and then use a special brush to clean the dust attached to the inner wall of the hole.

3, put the medicine tube

Check the fluidity of the resin by hand or visual inspection. After confirming, insert the drug into the bottom of the hole.

4, screw into the screw

Before the screw is buried, there is a 45° chamfer, the rear end is screwed in, the hex nut is driven by the power tool and screwed into the bottom of the hole.

5, curing curing

Allow the anchoring gel to solidify naturally, the curing time is based on the temperature reference curing schedule, and the screw should not be rotated or tapped during the curing period.


Storage

Storage period of 12 months, stored in a cool dry place


Installation data

model

Drilling diameter

Effective depth

Maximum anchoring thickness

Minimum substrate thickness

Installation torque

(KN)
Hef's influence coefficient on Vrd, cp (K)


Concrete vertebral body destructionConcrete splitting failure

Total length of screw

Critical spacing

Critical margin

Minimum spacingMinimum marginCritical spacingCritical margin
M8×110108015120122.02401204848240120110
M10×130129020.5130202.02701356060270135130
M12×1601411025160402.03301657272330165160
M16×1901812533175602.03751909696375188190
M20×26025170652201002.0510255120120510255260
M24×30028210652701602.0630315144144630315300
M30×3803528066.53402402.0840420180180840420380

1. The table installation data unit is mm, technical parameter unit kN

2. The table data is based on C20/C25 substrate concrete. If the grade of the substrate changes, the requirements of the technical department and the design drawings should be followed.

3. Form stainless steel 316 is A4-70 stainless steel

4. The table design load contains the material safety factor.

5. Form data is suitable for: correct installation, no margin, no spacing effect, minimum substrate thickness

6. For products not listed in the table, please refer to JGJ145-2013 Technical Specification for Post-Anchage of Concrete Structures. According to the calculation method of the ultimate state of bearing capacity, the corresponding data is obtained. For details, please consult the technical department of Shibang (Shanghai) Industrial Co., Ltd.


Technical Parameters


High-strength chemical anchor bolt technical parametersM8×110M10×130M12×160M16×190M20×260M24×300M30×380
Standard value / design valueStandard value / design valueStandard value / design valueStandard value / design valueStandard value / design valueStandard value / design valueStandard value / design value
Non-cracking concrete tensile parameters5.814.4/9.419.7/12.832.5/21.167.4/44.2101.8/67.0143.1/94.4231.0/153
8.822.9/15.131.2/20.551.6/33.869.5/45.6109.9/60.3150.6/82.8231.0/153
30414.4/5.019.7/6.732.5/11.167.4/23.3101.8/35.3143.149.6231.0/153
31620.0/10.527.3/14.345.3/15.669.5/38.0109.9/60.3150.6/82.8/
Non-cracking concrete shear parameters5.85.6/4.77.7/6.412.7/10.526.5/22.140.2/33.557.7/47.298.1/81.8
8.89.0/7.512.3/10.320.3/16.942.4/35.364.3/53.690.6/75.5157.0/130.8
3043.0/2.54.0/3.46.7/5.613.9/11.621.1/17.629.7/24.751.5/42.9
3166.3/5.38.6/7.214.3/11.929.8/24.845.2/37.763.7/53.1/
Cracked concrete tensile parameters5.814.4/9.419.7/12.832.5/21.150.0/27.278.8/43.1108.0/59.2165.4/91.1
8.822.9/15.131.2/20.541.1/22.450.0/27.278.8/43.1108.0/59.2165.4/91.1
30414.4/5.019.7/6.732.5/11.150.0/17.278.8/28.4108.0/41.3165.4/91.1
31620.0/10.527.3/14.341.1/14.150.0/27.278.8/43.1108.0/59.2/
Cracking concrete shear parameters5.85.6/4.77.7/6.412.7/10.526.5/22.140.2/33.557.7/47.298.1/81.8
8.89.0/7.512.3/10.320.3/16.942.4/35.364.3/53.690.6/75.5157.0/130.8
3043.0/2.54.0/3.46.7/5.613.9/11.621.1/17.629.7/24.751.5/42.9
3166.3/5.38.6/7.214.3/11.929.8/24.845.2/37.763.7/53.1/


1. The table installation data unit is mm, technical parameter unit kN

2. The table data is based on C20/C25 substrate concrete. If the grade of the substrate changes, the requirements of the technical department and the design drawings should be followed.

3. Form stainless steel 316 is A4-70 stainless steel

4. The table design load contains the material safety factor.

5. Form data is suitable for: correct installation, no margin, no spacing effect, minimum substrate thickness

6. For products not listed in the table, please refer to JGJ145-2013 Technical Specification for Post-Anchage of Concrete Structures. According to the calculation method of the ultimate state of bearing capacity, the corresponding data is obtained. For details, please consult the technical department of Shibang (Shanghai) Industrial Co., Ltd.


施邦客服人員會一對一竭心為您服務(wù)

信任由一次愉快的交談開始

咨詢熱線:021-3636 7599

Online Free call

Support hotline

021-3636 7599
Message Code

Scan code attention

Top
主站蜘蛛池模板: 亚洲人成色99999在线观看 | 日韩视频一二 | 色网在线观看 | 伸进她的小内裤疯狂揉摸小说 | 美女内射毛片在线看免费人动物 | 日日夜夜操网站 | 亚洲成在人线aⅴ免费毛片 久中文字幕 | 36d美女被视频在线观看 | 无码精品国产一区二区免费 | 欧美人体一区二区三区 | 97免费视频在线观看 | 国产成人无码免费网站 | 国产爆乳尤妮丝在线播放 | 亚洲大尺度专区无码浪潮AV | 国产成人精品福利色多多 | 国产sM重味一区二区三区 | 欧美一区二区美女 | 日韩av男人的天堂 | 999在线播放 | 亚洲无码偷拍福利 | 俄罗斯胖老太牲交 | 美女精品一区二区 | 性荡视频播放在线视频 | 高潮喷水无码中文字幕 | 人妻夫の上司犯感との中文字幕 | 永久免费看啪啪的网站 | 亚洲精品毛片一区二区 | 香蕉久久福利院 | 国产高清在线视频观看 | 国产免费人成在线视频 | 手机国产乱子伦精品视频 | 亚洲高清一区二区三区免费 | 国色天香综合网 | 喷水久久| 国产亚洲成av人片在线观看桃 | 最近的中文字幕在线看视频 | 亚洲熟女少妇一区二区 | 日韩欧一区二区三区 | www视频在线免费观看 | 亚洲中文字幕在线观看 | 中文字幕第31页 |